PROJECT
- Project Name:
- CSJ:0006-06-093
- Project Number:
- EABPRJB2000194
- Facility Name:
- HIGHWAY IH-20
- Location Address:
- FROM PINE ST TO LOOP 322
- Abilene, TX
- Location County:
- Taylor
- Start Date:
- 7/1/2012
- Completion Date:
- 1/1/1900
- Estimated Cost:
- $77,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- RECONSTRUCT FRONTAGE RDS RAMPS & TURNAROUNDS AT INTRSCTNFOR 1 WAY OPER BI/IV PF175 RV250 IN350 REC02194083 PD
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- TXDOT DISTRICT: ABILENE
- Owner Address:
- ALAN HUFSTUTLER PE 1350 ARNOLD BLVD
- ABILENE, TX 79601
- Owner Phone:
- (325) 690-9821
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- TXDOT DES DIVISION
- Design Firm Address:
- BRIAN BRADFORD 125 E 11TH ST
- AUSTIN, TX 78701
- Design Firm Phone:
- (512) 416-2684