PROJECT
- Project Name:
- O'CONNER RD. CORRIDOR ENHANCEM.-PHASE II
- Project Number:
- EABPRJB2802009
- Facility Name:
- O'CONNER RD. FROM SH183 TO ROCHELLE RD.
- Location Address:
- O'CONNER RD. FROM SH183 TO ROC
- Irving, TX 75060
- Location County:
- Dallas
- Start Date:
- 12/1/2011
- Completion Date:
- 10/1/2013
- Estimated Cost:
- $4,295,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Remove and widen existing road, sidewalk and wheelchairramps, water, wastewater, and storm water piping, and dr
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- CITY OF IRVING
- Owner Address:
- DAVID A SPRINGOB 825 W IRVING BLVD
- IRVING, TX 75060
- Owner Phone:
- (972) 721-2784
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- CITY OF IRVING
- Design Firm Address:
- STEVEN METZLER, P.E. 825 W. IRVING BLVD.
- IRVING, TX 75060
- Design Firm Phone:
- (972) 721-2611