PROJECT
- Project Name:
- CSJ: 0264-01-036
- Project Number:
- EABPRJB3000097
- Facility Name:
- HIGHWAY: BS 70-9
- Location Address:
- LIMITS FROM AVE B TO IH2
- Sweetwater, TX
- Location County:
- Nolan
- Start Date:
- 3/1/2013
- Completion Date:
- 12/17/2014
- Estimated Cost:
- $310,188
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- ACP OVERLAY, SIDEWALKS, COPB 7 GUTTERBI/IV PF175 RV315 IN375 PD$ 865
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- TXDOT DISTRICT ABILENE
- Owner Address:
- JESSE MENDOZA P E PO BOX 511
- BIG SPRING, TX 79721
- Owner Phone:
- (432) 263-4768
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- TXDOT DES DIVISION
- Design Firm Address:
- BRIAN BRADFORD P E 125 E 11TH ST
- AUSTIN, TX 78701
- Design Firm Phone:
- (512) 416-2684