PROJECT
- Project Name:
- MIDDLE SCHOOL CAMPUS IMPROVEMENTS
- Project Number:
- EABPRJB3807590
- Facility Name:
- MIDDLE SCHOOL CAMPUS
- Location Address:
- 510 CRYSTAL FARMS ROAD
- Tatum, TX 75691
- Location County:
- Rusk
- Start Date:
- 3/1/2013
- Completion Date:
- 1/1/2014
- Estimated Cost:
- $1,682,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Remodel of the existing Middle School cafeteria and Career and Technology shop with equipment upgrades
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- TATUM INDEPENDENT SCHOOL DISTRICT
- Owner Address:
- DREW JACKSON 510 CRYSTAL FARMS ROAD
- TATUM, TX 75691
- Owner Phone:
- (903) 947-0307
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- THACKER|DAVIS ARCHITECTS INC.
- Design Firm Address:
- MR. PHILLIP THACKER, AIA 1100 JUDSON ROAD, SUITE 620
- LONGVIEW, TX 75606
- Design Firm Phone:
- (903) 236-3771