PROJECT
- Project Name:
- FM 493 SOUTH
- Project Number:
- EABPRJB4815481
- Facility Name:
- CCSJ 0863-01-047 & CCSJ 0863-01-053
- Location Address:
- US 281 TO BUS 83
- Donna, TX 78537
- Location County:
- Hidalgo
- Start Date:
- 7/1/2014
- Completion Date:
- 6/28/2022
- Estimated Cost:
- $206,830
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Overlay existing roadway and construct pedestrian concrete sidewalks with ramps provide signing and pavement mar
- Square Footage:
- 1,000 ft 2
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TXDOT DISTRICT: PHARR
- Owner Address:
- HECTOR GONZALEZ 600 W. US 83
- PHARR, TX 78577
- Owner Phone:
- (956) 702-6100
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- L&G ENGINEERING
- Design Firm Address:
- CHRISTOPHER R. RODRIGUEZ 2100 W. EXPRESSWAY 83
- MERCEDES, TX 78570
- Design Firm Phone:
- (956) 565-9813