PROJECT
- Project Name:
- US 380
- Project Number:
- EABPRJB5805289
- Facility Name:
- CSJ, 0135-11-018 & CSJ, 0135-02-049
- Location Address:
- WEST OF CR 26 TO West of Lovers Ln
- Frisco, TX 75083
- Location County:
- Collin
- Start Date:
- 8/1/2015
- Completion Date:
- 12/30/2018
- Estimated Cost:
- $65,000,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Reconstruct exist. 4 lanes divided to 6 lanes divided with two lane access roads & grade separation @ DNT, BNSF
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Inspection Complete
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TXDOT DISTRICT: DALLAS
- Owner Address:
- BARRY HEARD 4777 E. HIGHWAY 80
- MESQUITE, TX 75150
- Owner Phone:
- (214) 320-6100
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- TXDOT
- Design Firm Address:
- JOSEPH SLACK 4777 US HWY 80 EAST
- MESQUITE, TX 75150
- Design Firm Phone:
- (214) 320-6100