PROJECT
- Project Name:
- STISD-ERHWSC SOUTHSIDE WWTP
- Project Number:
- EABPRJB5812745
- Facility Name:
- LAB BUILDING
- Location Address:
- 29530 STATE HWY 100
- San Benito, TX 78583
- Location County:
- Cameron
- Start Date:
- 4/1/2015
- Completion Date:
- 6/1/2015
- Estimated Cost:
- $75,000
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- LAB BUILDING FOR WASTEWATER TREATMENT PLANT/ PLANT OPERATOR USE ONLY.
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- EAST RIO HONDO WATER SUPPLY CORPORATION
- Owner Address:
- BRIAN E. MACMANUS PE 206 INDUSTRIAL PARKWAY
- RIO HONDO, TX 78583
- Owner Phone:
- (956) 748-3633
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- FERRIS FLINN & MEDINA LLC
- Design Firm Address:
- DAVID H. FLINN 1405 N. STUART PLACE RD.
- PALM VALLEY, TX 78552
- Design Firm Phone:
- (956) 364-2236