PROJECT
- Project Name:
- IH 35W FROM EAGLE PARKWAY TO SH 114
- Project Number:
- EABPRJB5820083
- Facility Name:
- CSJ 0081-13-041
- Location Address:
- IH 35W
- Denton, TX 76201
- Location County:
- Denton
- Start Date:
- 9/1/2015
- Completion Date:
- 9/1/2017
- Estimated Cost:
- $75,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construction of two lane southbound frontage road with ramp modifications.
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- TXDOT DISTRICT: DALLAS
- Owner Address:
- NANCY CLINE 4777 E. HIGHWAY 80
- MESQUITE, TX 75150
- Owner Phone:
- (214) 320-6100
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- CH2M HILL
- Design Firm Address:
- WILLIAM A BARRESI 12750 MERIT DRIVE, SUITE 1100
- DALLAS, TX 75251
- Design Firm Phone:
- (972) 663-2244