PROJECT
- Project Name:
- STONEWATER SUBDIVISION PHASE 2
- Project Number:
- EABPRJB5821307
- Facility Name:
- STONEWATER SUBDIVISION
- Location Address:
- TINAJERO WAY,JAIME DRIVE Riparian Rd,Siltstone Rd,Almod
- Manor, TX 78653
- Location County:
- Travis
- Start Date:
- 7/1/2015
- Completion Date:
- 1/1/2016
- Estimated Cost:
- $4,150,126
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- site preparation for construction of Stonewater Subdivision Phase 2; construction of roadways,sidewalks, utiliti
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- DR HORTON
- Owner Address:
- JUSTIN DAVIS 10700 PECAN PARK BLVD.
- AUSTIN, TX 78750
- Owner Phone:
- (512) 533-1430
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- DOUCET AND ASSOCIATES
- Design Firm Address:
- VINCENT D. MUSAT 7401B TEXAS 71 WEST, SUITE 160
- AUSTIN, TX 78735
- Design Firm Phone:
- (512) 583-2660