PROJECT
- Project Name:
- THE BARRACKS SUBDIVSION PHASE 202
- Project Number:
- EABPRJB5821575
- Facility Name:
- THE BARRACKS SUBDIVSION PHASE 202
- Location Address:
- TOWERS PARKWAY @ MOMMA BEAR DR
- College Station, TX 77845
- Location County:
- Brazos
- Start Date:
- 10/1/2015
- Completion Date:
- 3/1/2016
- Estimated Cost:
- $57,544
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- Sidewalks, curb ramps and cross walks in a public rightof way
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- HEATH PHILLIPS INVESTMENTS LLC
- Owner Address:
- HEATH PHILLIPS P.O. BOX 262
- WELLBORN, TX 77881
- Owner Phone:
- (979) 229-5906
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- SCHULTZ ENGINEERING LLC
- Design Firm Address:
- JOSEPH SCHULTZ, PE P.O. BOX 11995
- COLLEGE STATION, TX 77842
- Design Firm Phone:
- (979) 764-3900