PROJECT
- Project Name:
- SH 211
- Project Number:
- EABPRJB7808538
- Facility Name:
- SH 211
- Location Address:
- SH 211 - FM 1957 TO FM 471
- San Antonio, TX 78247
- Location County:
- Bexar
- Start Date:
- 6/1/2017
- Completion Date:
- 9/1/2018
- Estimated Cost:
- $21,409,944
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construct 2 lane highway, signalize intersections at FM1957 and FM 471, construct cross drainage structures
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- PETER F,GROJEAN
- RAS #:
- 75
- RAS Address:
- 1218 E EUCLID AVE STE 1
- SAN ANTONIO, TX 78212
- RAS Phone:
- (210) 271-1014
OWNER
- Owner Name:
- BEXAR COUNTY PUBLIC WORKS DEPARTMENT
- Owner Address:
- 233 N PECOS _
- SAN ANTONIO, TX 78207
- Owner Phone:
- (210) 335-6700
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- PAPE-DAWSON ENGINEERS
- Design Firm Address:
- DAN THOMA 2000 NW LOOP 410
- SAN ANTONIO, TX 78213
- Design Firm Phone:
- (210) 375-9000