PROJECT
- Project Name:
- THE CANYONS AT CIMARRON
- Project Number:
- EABPRJB7809645
- Facility Name:
- EP RIVERBEND DEVELOPMENT
- Location Address:
- PROPERTY ID: 627901
- El Paso, TX 79911
- Location County:
- El Paso
- Start Date:
- 3/1/2017
- Completion Date:
- 6/1/2018
- Estimated Cost:
- $8,794,820
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- Providing 14 Building for Retail and 1 for a potential Restaurant total of 15 Buildings. Only doing Shell Drawin
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- PARRA, ABRIL
- RAS #:
- 1397
- RAS Address:
- 2619 E MISSOURI AVE
- EL PASO, TX 79903
- RAS Phone:
- (915) 727-0537
OWNER
- Owner Name:
- EP RIVERBEND
- Owner Address:
- WILL HARVEY 4798 DONIPHAN DRIVE
- EL PASO, TX 79922
- Owner Phone:
- (915) 584-8242
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- IN*SITU ARCHITECTURE
- Design Firm Address:
- EDGAR LOPEZ 123 W. MILLS AVENUE, SUITE 410
- EL PASO, TX 79901
- Design Firm Phone:
- (915) 533-7488