PROJECT
- Project Name:
- 5TH WARD SIDEWALK CONNECTIVITY PHASE II
- Project Number:
- EABPRJB7809825
- Facility Name:
- 5TH WARD SIDEWALK CONNECTIVITY PHASE II
- Location Address:
- LYONS AVENUE, FROM SOLO STREET Lockwood Drive, and Lockwood D
- Houston, TX 77020
- Location County:
- Harris
- Start Date:
- 8/1/2017
- Completion Date:
- 10/1/2017
- Estimated Cost:
- $500,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Proposed ADA accessible, 5' wide route connecting Finnegan Park, Wheatley High School, Atherton Elementary Schoo
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- WALTON, JUSTIN
- RAS #:
- 1329
- RAS Address:
- 8190 FM 455 W
- SANGER, TX 76266
- RAS Phone:
- (940) 368-1989
OWNER
- Owner Name:
- HARRIS COUNTY PUBLIC INFRASTRUCTURE DEPT
- Owner Address:
- TOM VU 1001 PRESTON, 7TH FLOOR
- HOUSTON, TX 77002
- Owner Phone:
- (713) 274-3883
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- HALFF ASSOCIATES INC
- Design Firm Address:
- ART PISANA 14800 ST MARY'S LN, SUITE 160
- HOUSTON, TX 77079
- Design Firm Phone:
- (713) 588-2464