PROJECT
- Project Name:
- PUMP STATION 3 PHASE 1
- Project Number:
- EABPRJB7815064
- Facility Name:
- PUMP STATION 3
- Location Address:
- 5324 BEE CAVE ROAD
- West Lake Hills, TX 78746
- Location County:
- Travis
- Start Date:
- 4/1/2017
- Completion Date:
- 12/1/2017
- Estimated Cost:
- $400,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Parking lot construction, detention pod construction, ramp and sidewalk construction. Storm water, water, and wa
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- LACOUR, ANDREA
- RAS #:
- 1313
- RAS Address:
- 2103 E 18TH ST STE B
- AUSTIN, TX 78702
- RAS Phone:
- (360) 631-1718
OWNER
- Owner Name:
- TRAVIS COUNTY W.C.& I.D. #10
- Owner Address:
- CARLA GLASS 5450 BEE CAVES RD STE 2-A
- WEST LAKE HILLS, TX 78746
- Owner Phone:
- (512) 327-2230
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- DANNENBAUM ENGINEERING CO
- Design Firm Address:
- RAFAEL BECKMANN 3409 EXECUTIVE CTR DR STE 129
- WEST LAKE HILLS, TX 78731
- Design Firm Phone:
- (512) 345-8505