PROJECT
- Project Name:
- C106-03-00-C006 PHASE 3 CHANNEL CONVE
- Project Number:
- EABPRJB7816706
- Facility Name:
- HCFCD PROJECT C106-03-00-C006
- Location Address:
- SOUTH OF COLLEGE AVE TO IH-45
- Houston, TX 77034
- Location County:
- Harris
- Start Date:
- 9/1/2017
- Completion Date:
- 11/5/2019
- Estimated Cost:
- $6,105,453
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- It's a Harris County Flood Control District Project. Theproject location is South of College Ave to IH-45. The
- Square Footage:
- 7,300 ft 2
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- TULLIER, DONALD
- RAS #:
- 1105
- RAS Address:
- 1225 NORTH LOOP W STE 935
- HOUSTON, TX 77008
- RAS Phone:
- (713) 864-8494
OWNER
- Owner Name:
- HARRIS COUNTY FLOOD CONTROL DISTRICT
- Owner Address:
- ISABEL FUNG 9900 NORTHWEST FREEWAY
- HOUSTON, TX 77092
- Owner Phone:
- (713) 684-4127
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- HR GREEN INC.
- Design Firm Address:
- STEPHEN A. SPARKS 11011 RICHMOND AVE. SUITE 200
- HOUSTON, TX 77042
- Design Firm Phone:
- (713) 338-8008