PROJECT
- Project Name:
- SH 288 MANAGED LANES
- Project Number:
- EABPRJB7820137
- Facility Name:
- 288 MANGED LANES
- Location Address:
- 280 NORTH OF CR 58 TO 1644 North of FM 2234
- Pearland, TX 77584
- Location County:
- Brazoria
- Start Date:
- 6/1/2017
- Completion Date:
- 6/1/2019
- Estimated Cost:
- $136,730
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construction of 288 Managed Lanes-consisting of gradingstructures, base, signing and striping
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- HUSZKA, ATTILA
- RAS #:
- 150
- RAS Address:
- 810 HIGHWAY 6 S STE 111
- HOUSTON, TX 77079
- RAS Phone:
- (512) 577-0122
OWNER
- Owner Name:
- BRAZORIA COUNTY
- Owner Address:
- MATT HANKS,JD,PE 451 N VELASCO, SUITE 230
- ANGLETON, TX 77515
- Owner Phone:
- (979) 864-1265
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- HDR ENGINEERING INC.
- Design Firm Address:
- KEITH A.NESHYBA 4828 LOOP CENTRAL DR #800
- HOUSTON, TX 77091
- Design Firm Phone:
- (713) 622-9264