PROJECT
- Project Name:
- TEMPORARY EMPLOYEE FACILITY
- Project Number:
- EABPRJB8810312
- Facility Name:
- FORT WORTH NORTH MANUFACTURING
- Location Address:
- 6201 SOUTH FREEWAY
- Fort Worth, TX 76134
- Location County:
- Tarrant
- Start Date:
- 2/1/2018
- Completion Date:
- 3/1/2018
- Estimated Cost:
- $243,429
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- Built two links; one to connect the temporary trailers to the building and two to provide connections between th
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- CHRISTENSEN, DAVID
- RAS #:
- RAS Address:
- , TX
- RAS Phone:
OWNER
- Owner Name:
- ALCON LABORATORIES INC.
- Owner Address:
- JOE NOTOLLI 6201 SOUTH FREEWAY
- FORT WORTH, TX 76134
- Owner Phone:
- (817) 229-6745
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- EWINGCOLE
- Design Firm Address:
- AITOR SANCHEZ-PRADO 100 NORTH 6TH STREET
- PHILADELPHIA, PA 19106
- Design Firm Phone:
- (215) 923-2020