PROJECT
- Project Name:
- OUTER LOOP ROADWAY IMPROVEMENTS PH IIIB
- Project Number:
- EABPRJB8817294
- Facility Name:
- OLD WACO ROAD
- Location Address:
- TARVER TO FM 2305
- Temple, TX 76504
- Location County:
- Bell
- Start Date:
- 6/1/2018
- Completion Date:
- 7/1/2019
- Estimated Cost:
- $6,900,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Road Improvement widening with utilities and sidewalks on Old Waco Rd. from FM 2305 to Tarver Road.
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Inspection Complete
RAS
- RAS Name:
- ALEXANDER, JOHN
- RAS #:
- 1292
- RAS Address:
- 1712 MORROW AVE
- WACO, TX 76707
- RAS Phone:
- (254) 537-3645
OWNER
- Owner Name:
- CITY OF TEMPLE
- Owner Address:
- RICHARD WILSON 2 N. MAIN STREET
- TEMPLE, TX 76501
- Owner Phone:
- (254) 298-5620
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- KPA ENGINEERS
- Design Firm Address:
- R. DAVID PATRICK, PE 1 S. MAIN ST.
- TEMPLE, TX 76501
- Design Firm Phone:
- (254) 773-3731