PROJECT
- Project Name:
- BOBBY JOE HILL PK-8 CAMPUS
- Project Number:
- EABPRJB9801740
- Facility Name:
- BOBBY JOE HILL PK-8 CAMPUS
- Location Address:
- 4835 BLOSSOM AVE.
- El Paso, TX 79924
- Location County:
- El Paso
- Start Date:
- 1/1/2019
- Completion Date:
- 12/30/2022
- Estimated Cost:
- $26,400,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- The Project consists of the consolidation of Collins Elementary with Terrace Hills Middle School to be named Bob
- Square Footage:
- 5,000 ft 2
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- OLAF E,BRUNJES
- RAS #:
- 1228
- RAS Address:
- PO BOX 5301
- EL PASO, TX 79953
- RAS Phone:
- (915) 209-2580
OWNER
- Owner Name:
- EL PASO INDEPENDENT SCHOOL DISTRICT
- Owner Address:
- IRENE RAMIREZ, PE 6531 BOEING DRIVE
- EL PASO, TX 79925
- Owner Phone:
- (915) 230-2291
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- DEKKER/PERICH/SABATINI
- Design Firm Address:
- C. BARRY TAYLOR 500 S. TAYLOR ST.; SUITE 750
- AMARILLO, TX 79101
- Design Firm Phone:
- (806) 376-8199