PROJECT
- Project Name:
- CONTROL BUILDING
- Project Number:
- EABPRJB9801884
- Facility Name:
- CENTRALWATERINTEGRATIONPIPELINETERMINUS
- Location Address:
- 20015 HARDY OAK BLVD
- San Antonio, TX 78258
- Location County:
- Bexar
- Start Date:
- 10/1/2018
- Completion Date:
- 6/1/2020
- Estimated Cost:
- $550,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Construction of a new Control Building for the San Antonio Water System Water Treatment Facility as part of the
- Square Footage:
- Unknown
- Are the private funds provided by the tenant?
- Not available
- Current Status:
-
Project Closed
RAS
- RAS Name:
- RICHARD TODD,LOZANO
- RAS #:
- 93
- RAS Address:
- 6101 WOODVIEW AVE
- AUSTIN, TX 78757
- RAS Phone:
- (512) 374-1696
OWNER
- Owner Name:
- SAN ANTONIO WATER SYSTEM
- Owner Address:
- ALISSA LOCKETT 2800 US HWY 281 NORTH
- SAN ANTONIO, TX 78212
- Owner Phone:
- (210) 704-7297
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- LOPEZ SALAS ARCHITECTS
- Design Firm Address:
- ROBERT LOPEZ 237 W TRAVIS ST #207
- SAN ANTONIO, TX 78205
- Design Firm Phone:
- (210) 737-4448