PROJECT
- Project Name:
- 2019 CDBG Residential Street and Sidewalk Rebuilds
- Project Number:
- TABS2019004181
- Facility Name:
- City of Arlington Right-of-Way
- Location Address:
- Various City of Arlington Rights of Way
- Arlington, TX 76010
- Location County:
- Tarrant
- Start Date:
- 4/1/2019
- Completion Date:
- 1/24/2020
- Estimated Cost:
- $125,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Removing and replacing sidewalk and curb ramps with new roadway construction.
- Square Footage:
- 16,500 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- GEORGE A,PATTERSON
- RAS #:
- 503
- RAS Address:
- PO BOX 8616
- FORT WORTH, TX 76124
- RAS Phone:
- (817) 451-0399
OWNER
- Owner Name:
- City of Arlington Right of Way
- Owner Address:
- 101 W. Abram St.
- Arlington, Texas 76010
- Owner Phone:
- (817) 459-6550
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- Elder Engineering, Inc.
- Design Firm Address:
- P.O. Box 698
- Mansfield, Texas 76063
- Design Firm Phone:
- (817) 733-8144