PROJECT
- Project Name:
- Barbara Drive Drainage Phase 2
- Project Number:
- TABS2019006274
- Facility Name:
- Barbara Drive
- Location Address:
- Barbara Dr from Oblate to McCulough Ave
- San Antonio, TX 78216
- Location County:
- Bexar
- Start Date:
- 10/1/2019
- Completion Date:
- 3/31/2022
- Estimated Cost:
- $6,000,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Storm drain improvements, including roadway, curb & gutter, sidewalk, curb ramps and driveways.
- Square Footage:
- 60,000 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- JESUS E,LARDIZABAL
- RAS #:
- 1051
- RAS Address:
- 1200 W 39TH 1/2 ST
- AUSTIN, TX 78756
- RAS Phone:
- (512) 410-7059
OWNER
- Owner Name:
- City of San Antonio - Sean Strong
- Owner Address:
- 114 W Commerce, 6th Floor
- San Antonio, Texas 78205
- Owner Phone:
- (210) 207-7196
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- Halff Associates, Inc
- Design Firm Address:
- 100 NE Interstate 410 Loop
- San Antonio, Texas 78216
- Design Firm Phone:
- (210) 789-1895