PROJECT
- Project Name:
- US 281 Intersection Enhancements
- Project Number:
- TABS2019008126
- Facility Name:
- CSJ: 0249-08-044
- Location Address:
- US 281 at US 180 and 1st Ave
- Mineral Wells, TX 76067
- Location County:
- Palo Pinto
- Start Date:
- 6/1/2019
- Completion Date:
- 1/31/2022
- Estimated Cost:
- $90,780
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Reconstruction of street paving and sidewalks to enhance downtown area and to improve pedestrian access.
- Square Footage:
- 10,917 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TxDOT District: Ft Worth (Weatherford Area Office)
- Owner Address:
- 1427 W. Bankhead
- Weatherford, Texas 76086
- Owner Phone:
- (682) 229-2800
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- Schrickel Rollins PSC
- Design Firm Address:
- 255 N. Center Street, Suite 200
- Arlington, Texas 76011
- Design Firm Phone:
- (817) 649-3216