This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
4-lane concrete boulevard with curb and gutter will be built to replace existing 2-lane asphalt road from NETCO Pipeline to Fm 1464. Sidewalk will be built on one side (north side). Roadway design will include traffic signal at Westmoor intersection.