PROJECT
- Project Name:
- Collins Street (East Park Row Dr to E. Pioneer Pkwy (Spur 303)
- Project Number:
- TABS2019014612
- Facility Name:
- Collins Street
- Location Address:
- Collins Street ROW
- Arlington, TX 76010
- Location County:
- Tarrant
- Start Date:
- 9/2/2019
- Completion Date:
- 7/9/2021
- Estimated Cost:
- $500,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Reconstruction of the outer 2 lanes and panel replacement for the middle 3 lanes on Collins St. with replacing sidewalk and ramps in Arlington, Texas
- Square Footage:
- 45,000 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- GEORGE A,PATTERSON
- RAS #:
- 503
- RAS Address:
- PO BOX 8616
- FORT WORTH, TX 76124
- RAS Phone:
- (817) 451-0399
OWNER
- Owner Name:
- City of Arlington - Attn: Kevin Ly
- Owner Address:
- 101 W. Abram St.
- Arlington, Texas 76010
- Owner Phone:
- (817) 265-3311
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- CP&Y, Inc.
- Design Firm Address:
- 115 W 7th Street Ste 1500
- Fort Worth, Texas 76102
- Design Firm Phone:
- (817) 354-0189