PROJECT
- Project Name:
- HMH-WT Level 4 Cath Lab Buildout
- Project Number:
- TABS2019016376
- Facility Name:
- Houston Methodist Hospital
- Location Address:
- 6565 Fannin
- Houston, TX 77074
- Location County:
- Harris
- Start Date:
- 12/1/2019
- Completion Date:
- 7/31/2020
- Estimated Cost:
- $2,654,700
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- Buildout of shell space within Walter Tower (Level 4) to accommodate two Cath Labs and their immediate support (control and equipment rooms).
- Square Footage:
- 3,336 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Inspection Complete
OWNER
- Owner Name:
- Houston Methodist Hospital
- Owner Address:
- 6565 Fannin
- Houston, Texas 77030
- Owner Phone:
- (713) 441-6212
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- EYP
- Design Firm Address:
- 1111 Louisiana, 26th Floor
- Houston, Texas 77002
- Design Firm Phone:
- (713) 852-3609