HMH Walter Tower Level 12 Universal Care Bed Floor Buildout
Project Number:
TABS2019016782
Facility Name:
Houston Methodist Hospital Walter Tower
Location Address:
6565 Fannin
Houston, TX 77030
Location County:
Harris
Start Date:
11/1/2019
Completion Date:
8/31/2020
Estimated Cost:
$11,500,000
Type of Work:
Renovation/Alteration
Type of Funds:
This project is privately funded, on private land for private use.
Scope of Work:
Buildout of shell floor within Walter Tower (Level 12) to accommodate (36) Universal Care Beds and required support spaces. The Build out will require tie-ins to existing Mechanical, Electrical, Low Voltage, and Security Systems.