PROJECT
- Project Name:
- 15th Floor Corridor and Restroom Renovation
- Project Number:
- TABS2020001751
- Facility Name:
- The Summit
- Location Address:
- 545 E John Carpenter Freeway
- Las Colinas, TX 75206
- Location County:
- Dallas
- Start Date:
- 10/1/2019
- Completion Date:
- 2/29/2020
- Estimated Cost:
- $256,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- Renovate common corridor, elevator lobby and restroom on 15th floor.
- Square Footage:
- 2,806 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- FRED DEAN,SHINAULT
- RAS #:
- 309
- RAS Address:
- 5435 N GARLAND AVE STE 140-121
- GARLAND, TX 75040
- RAS Phone:
- (214) 497-0926
OWNER
- Owner Name:
- Rosemont Summit Operating, LLC c/o Laura Allen
- Owner Address:
- 545 E. John Carpenter Fwy Suite 1550
- Las Colinas, Texas 75206
- Owner Phone:
- (214) 574-4450
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- AM Design Associates, LLC
- Design Firm Address:
- PO Box 800727
- Dallas, Texas 75380
- Design Firm Phone:
- (214) 271-4672