PROJECT
- Project Name:
- San Angelo Transmission Service Center, Material Storage Building C
- Project Number:
- TABS2020002286
- Facility Name:
- Material Storage Building C
- Location Address:
- 1129 Gateway Drive
- San Angelo, TX 76905
- Location County:
- Tom Green
- Start Date:
- 10/9/2019
- Completion Date:
- 3/1/2020
- Estimated Cost:
- $123,949
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- New pre-engineered metal storage building, unconditioned.
- Square Footage:
- 1,945 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- LANDY,PERKINS
- RAS #:
- 371
- RAS Address:
- 6013 86TH ST
- LUBBOCK, TX 79424
- RAS Phone:
- (806) 543-1873
OWNER
- Owner Name:
- American Electric Power (Heather Cantu, Facilities Project Coordinator)
- Owner Address:
- 701 N. 4th Street
- Abilene, Texas 79601
- Owner Phone:
- (325) 280-8224
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- WKMC Architects, Inc.
- Design Firm Address:
- 909 South Tancahua St.
- Corpus Christi, Texas 78404
- Design Firm Phone:
- (361) 561-2126