PROJECT
- Project Name:
- TAMU MSC DM 2020 Replace Hydronic CHW/HHW Piping
- Project Number:
- TABS2020002377
- Facility Name:
- Memorial Student Center, Building 0454
- Location Address:
- 275 Joe Routt
- College Station, TX 77843
- Location County:
- Brazos
- Start Date:
- 12/2/2019
- Completion Date:
- 9/30/2020
- Estimated Cost:
- $645,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Replace Hydronic Chill Water and Boiler Water Piping
- Square Footage:
- 10,000 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- EDDIE,HARE
- RAS #:
- 8
- RAS Address:
- 5855 FOSTER RD
- BRYAN, TX 77807
- RAS Phone:
- (979) 820-0149
OWNER
- Owner Name:
- TAMU SSC Service Solutions-Iraj Solouki
- Owner Address:
- TAMU MS 1371
- College Station, Texas 77843
- Owner Phone:
- (979) 436-7863
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- Patterson architects
- Design Firm Address:
- 701 South Texas Ave
- Bryan, Texas 77803
- Design Firm Phone:
- (979) 775-6036