PROJECT
- Project Name:
- Harbor District Overflow Parking Garage
- Project Number:
- TABS2020007628
- Facility Name:
- Parking Garage
- Location Address:
- 2800 Lakefront Trail
- Rockwall, TX 75032
- Location County:
- Rockwall
- Start Date:
- 1/31/2020
- Completion Date:
- 6/30/2020
- Estimated Cost:
- $4,600,000
- Type of Work:
- New Construction
- Type of Funds:
- This project is privately funded, on private land for private use.
- Scope of Work:
- New construction of a 2 level parking structure
- Square Footage:
- 65,900 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- GEORGE K,GRIMES
- RAS #:
- 49
- RAS Address:
- 5808 ROYAL CLUB DR
- ARLINGTON, TX 76017
- RAS Phone:
- (817) 915-8484
OWNER
- Owner Name:
- Jim Ziegler
- Owner Address:
- 8222 Douglas Avenue, Suite 350
- Dallas, Texas 75225
- Owner Phone:
- (214) 389-6195
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- BGO Architects
- Design Firm Address:
- 4202 Beltway Drive
- Addison, Texas 75001
- Design Firm Phone:
- (214) 520-8878