PROJECT
- Project Name:
- Fume Hood Replacement at John Marshall HS
- Project Number:
- TABS2020009877
- Facility Name:
- Marshall High School
- Location Address:
- 8000 Lobo Lane
- Leon Valley, TX 78240
- Location County:
- Bexar
- Start Date:
- 5/15/2020
- Completion Date:
- 8/11/2020
- Estimated Cost:
- $1,181,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Replace fume hoods, air handler, and exhaust fans. Adding new vav boxes and connecting waste piping to existing waste pipe.
- Square Footage:
- 30,000 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- PETER F,GROJEAN
- RAS #:
- 75
- RAS Address:
- 1218 E EUCLID AVE STE 1
- SAN ANTONIO, TX 78212
- RAS Phone:
- (210) 271-1014
OWNER
- Owner Name:
- Jacob Villarreal
- Owner Address:
- 5900 Evers Road, Building E
- San Antonio, Texas 78238
- Owner Phone:
- (210) 397-1243
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- Cleary Zimmermann Engineers
- Design Firm Address:
- 1344 S. Flores
- San Antonio, Texas 78204
- Design Firm Phone:
- 210-447-6100