This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Replace existing 8 ft wide asphalt trail with a 5'-0" wide concrete trail; provide 2 play areas with engineered wood fiber and plastic borders; provide accessible path from school to the renovated play area with access curb ramps and walk striping