PROJECT
- Project Name:
- CSJ: 0144-04-046 Install and Upgrade Victoria Area Sidewalks
- Project Number:
- TABS2020015823
- Facility Name:
- SH 238 from FM 2433 to SH 35 & FM 1090 from SH 238 to 0.6 mi.of SH 238
- Location Address:
- SH 238 & FM 1090
- Port Lavaca, TX 77979
- Location County:
- Calhoun
- Start Date:
- 7/1/2021
- Completion Date:
- 3/31/2023
- Estimated Cost:
- $2,730,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Install and upgrade sidewalks including curb ramps & driveways within the project limits.
- Square Footage:
- 305,334 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TEXAS DEPT OF TRANSPORTATION
- Owner Address:
- - 403 HUCK STREET
- Yoakum, Texas 77995
- Owner Phone:
- (361) 293-4460
- Contact Name:
- Jonathan Rogers
DESIGN FIRM
- Design Firm Name:
- BGE, Inc.
- Design Firm Address:
- 7330 San Pedro Ave. STE 202
- San Antonio, Texas 78216
- Design Firm Phone:
- (210) 581-3600