PROJECT
- Project Name:
- Premier High School - Odessa
- Project Number:
- TABS2020017949
- Facility Name:
- Premier High School Odessa
- Location Address:
- 1801 N. Lee
- Odessa, TX 79761
- Location County:
- Ector
- Start Date:
- 6/2/2020
- Completion Date:
- 10/2/2020
- Estimated Cost:
- $750,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Renovation of an existing two story facility to meet the space requirement of the new high school
- Square Footage:
- 9,101 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- PETER,WALPER
- RAS #:
- 1491
- RAS Address:
- 3101 HAYNES DR
- MIDLAND, TX 79705
- RAS Phone:
- (432) 967-4212
OWNER
- Owner Name:
- Responsive Education Solutions
- Owner Address:
- 1301 Waters Ridge Drive
- Lewisville, Texas 75057
- Owner Phone:
- (972) 316-3663
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- Hidell and Associates Architects
- Design Firm Address:
- 3033 Kellway Drive Suite 120
- Carrollton, Texas 75006
- Design Firm Phone:
- (972) 416-4666