PROJECT
- Project Name:
- Cotton Bayou WWTP- Dewatering Facility
- Project Number:
- TABS2020020496
- Facility Name:
- Cotton Bayou Wastewater Treatment Plant
- Location Address:
- 3855 Perry Ave
- Mont Belvieu, TX 77523
- Location County:
- Chambers
- Start Date:
- 1/1/2021
- Completion Date:
- 3/18/2022
- Estimated Cost:
- $350,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- New split-level, partially enclosed, pre-engineered metal building canopy for loading and dewatering equipment.
- Square Footage:
- 3,980 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- MEGHAN BROUSSARD,SIMECEK
- RAS #:
- 1445
- RAS Address:
- PO BOX 696
- FRIENDSWOOD, TX 77549
- RAS Phone:
- (281) 660-4429
OWNER
- Owner Name:
- Mont Belvieu
- Owner Address:
- P.O. Box 1048
- Mont Belvieu, Texas 77580
- Owner Phone:
- (281) 576-2213
- Contact Name:
- Nathan Watkins
DESIGN FIRM
- Design Firm Name:
- H2B inc
- Design Firm Address:
- 1225 N Loop W Suite 800
- Houston, Texas 77008
- Design Firm Phone:
- 713-864-2900