This project is privately funded, on private land for private use.
Scope of Work:
Estimated cost is 2.9M.
A 1 story metal building. It is 12,157SF and consists of an Additive Area (H-2 Occupancy) and a Catalyst Area (H-3 Occupancy). A fire alarm system and a sprinkler system will be installed.