PROJECT
- Project Name:
- Evans Road Phase 1-Bulverde Road to TPC Parkway
- Project Number:
- TABS2021001884
- Facility Name:
- None
- Location Address:
- Evans Road between Bulverde Road and TPC Parkway None
- San Antonio, TX 78259
- Location County:
- Bexar
- Start Date:
- 10/30/2018
- Completion Date:
- 10/31/2020
- Estimated Cost:
- $269,000
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- 13,000 LF of 5' concrete sidewalks including appropriate curb ramps. Also includes 4 pedestrian push button signal poles
- Square Footage:
- 65,000 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- STEPHEN A,MEYER
- RAS #:
- 1078
- RAS Address:
- 323 W AGARITA AVE
- SAN ANTONIO, TX 78212
- RAS Phone:
- (210) 250-1651
OWNER
- Owner Name:
- Bexar County Public Works
- Owner Address:
- 1948 Probandt
- San Antonio, Texas 78214
- Owner Phone:
- (210) 615-5840
- Contact Name:
- Reggie Fountain, PE
DESIGN FIRM
- Design Firm Name:
- CDS Muery
- Design Firm Address:
- 100 NE Loop 410, Suite 300
- San Antonio, Texas 78216
- Design Firm Phone:
- (210) 581-1111