This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Bicycle/Ped. Imp. May include 8’ wide SUP addition along both sides; retaining walls; possible reconst. outside ROW at some driveways to acceptable profile grades. Reconst. ped. ramps & driveways for ADA compliance. Connect new median to existing.