PROJECT
- Project Name:
- Pedestrian & Bike Bridge over Brays Bayou from N. Braeswood to S. Braeswood Blvd.
- Project Number:
- TABS2021014570
- Facility Name:
- Brays Bayou (HCFCD Unit No. D100-00-00)
- Location Address:
- 3753 N. Braeswood & 3766 S. Braeswood Blvd.
- Houston, TX 77025
- Location County:
- Harris
- Start Date:
- 9/1/2021
- Completion Date:
- 2/7/2025
- Estimated Cost:
- $1,650,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- New pedestrian & bike bridge construction at Brays Bayou. Sidewalk connections and ADA ramps constructed from N. Braeswood Blvd. to S. Braeswood Blvd.
- Square Footage:
- 5,583 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- LAURA,FULKERSON
- RAS #:
- 96
- RAS Address:
- PO BOX 2008
- MASON, TX 76856
- RAS Phone:
- (713) 598-1505
OWNER
- Owner Name:
- HARRIS COUNTY
- Owner Address:
- 1111 FANNIN ST 12TH FL
- Houston, Texas 77002
- Owner Phone:
- (713) 274-3626
- Contact Name:
- MIKE CHANG
DESIGN FIRM
- Design Firm Name:
- Costello, Inc.
- Design Firm Address:
- 2107 CityWest Blvd.
- Houston, Texas 77042
- Design Firm Phone:
- 713-783-7788