This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Construct approximately 1000LF of 6" sidewalk, 600LF of 4' cast in place retaining wall with handrailing, regrade 300 LF of backslope interceptor swales and construct two concrete manholes with pipe and outfall into exist Willowfork Drainage Ditch.