This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Altering existing two-way stop intersection to be a mini-roundabout with 6' sidewalks and ADA ramps along the outside of the roundabout and improving the bar ditches and drainage culvert underneath the intersection to contain the 100-year design stor