This project is privately funded, on private land for private use.
Scope of Work:
The proposed scope includes the upgrade of Sterile Cores at level 2, 3 and 4. This includes removing the existing ceilings and replacing with a 1-hour horizontal membrane with surface mounted light fixtures and fire dampers at individual diffusers.