PROJECT
- Project Name:
- CSJ:0179-04-100, Install and upgrade Wharton Area Office Sidewalks
- Project Number:
- TABS2022006586
- Facility Name:
- SH 35 from Bayou Dr. to 12th St.
- Location Address:
- SH 35
- Bay City, TX 77414
- Location County:
- Matagorda
- Start Date:
- 8/1/2022
- Completion Date:
- 12/1/2023
- Estimated Cost:
- $1,278,630
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Install and upgrade sidewalks, including curb ramps and driveways, within the project limits.
- Square Footage:
- 113,973 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
OWNER
- Owner Name:
- TxDOT District: Yoakum
- Owner Address:
- 403 Huck St.
- Yoakum, Texas 77995
- Owner Phone:
- 979-534-3141
- Contact Name:
- Ryan Simper
DESIGN FIRM
- Design Firm Name:
- BGE, Inc.
- Design Firm Address:
- 7330 San Pedro Ave., Ste 202
- San Antonio, Texas 78216
- Design Firm Phone:
- (210) 581-3600