PROJECT
- Project Name:
- SH 78 & FM 544
- Project Number:
- TABS2022008970
- Facility Name:
- CSJ: 0281-02-075, etc
- Location Address:
- SH 78 at East Brown St & FM 544 at McCreary Rd
- Wylie, TX 75098
- Location County:
- Collin
- Start Date:
- 7/1/2022
- Completion Date:
- 5/1/2023
- Estimated Cost:
- $1,206,494
- Type of Work:
- Renovation/Alteration
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Improving Traffic Signals, Pedestrian Signals, Adding Through Lane and Left Turn Lane.
- Square Footage:
- 1,226 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- FRANK,FONSECA
- RAS #:
- 1184
- RAS Address:
- 526 WILLIAMSBURG PL
- SAN ANTONIO, TX 78201
- RAS Phone:
- (210) 733-1748
OWNER
- Owner Name:
- TxDOT District: Dallas
- Owner Address:
- 4777 E. Highway 80
- Mesquite, Texas 75150
- Owner Phone:
- (972) 542-2345
- Contact Name:
DESIGN FIRM
- Design Firm Name:
- Kimley-Horn
- Design Firm Address:
- 13455 Noel Rd Two Galleria Tower, Suite 700
- Dallas, Texas 75240
- Design Firm Phone:
- (972) 770-1300