This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Installation of new reinforced concrete sidewalk along east side of the Bering Ditch (W142-00-00) from Windswept Ln to Westpark Dr. Maximum width of the sidewalk is 8-ft. Also include, ADA ramps, street crossing and erosion & sediment control.