PROJECT
- Project Name:
- Headwaters at Barton Creek, Phase 3
- Project Number:
- TABS2022019635
- Facility Name:
- N/A
- Location Address:
- Intersection of Hazy Hills Loop & Roy Branch Road
- Dripping Springs, TX 78620
- Location County:
- Hays
- Start Date:
- 5/1/2022
- Completion Date:
- 4/27/2023
- Estimated Cost:
- $71,256
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Sidewalks associated with the construction of public roadways and connecting trails (to be built by others).
- Square Footage:
- 9,176 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- JESUS E,LARDIZABAL
- RAS #:
- 1051
- RAS Address:
- 1200 W 39TH 1/2 ST
- AUSTIN, TX 78756
- RAS Phone:
- (512) 410-7059
OWNER
- Owner Name:
- WFC HEADWATERS OWNER VII, L.P.
- Owner Address:
- 500 Boylston Street, Suite 2010
- Boston, Massachusetts 02116
- Owner Phone:
- (617) 221-8400
- Contact Name:
- Jesse R. Baker
DESIGN FIRM
- Design Firm Name:
- Malone/Wheeler
- Design Firm Address:
- 5113 Southwest Parkway, Suite 260
- Austin, Texas 78735
- Design Firm Phone:
- (512) 899-0601