PROJECT
- Project Name:
- Southwest Bypass Extension
- Project Number:
- TABS2022019887
- Facility Name:
- N/A
- Location Address:
- N. bank of San Gabriel River s. fork to s. of SH99
- Georgetown, TX 78628
- Location County:
- Williamson
- Start Date:
- 8/1/2022
- Completion Date:
- 2/28/2023
- Estimated Cost:
- $624,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Sidewalk addition on Southwest Bypass from the San Gabriel River to SH 29.
- Square Footage:
- 59,500 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Project Closed
RAS
- RAS Name:
- JESUS E,LARDIZABAL
- RAS #:
- 1051
- RAS Address:
- 1200 W 39TH 1/2 ST
- AUSTIN, TX 78756
- RAS Phone:
- (512) 410-7059
OWNER
- Owner Name:
- City of Georgetown
- Owner Address:
- 300-1 Industrial Ave.
- Georgetown, Texas 78627
- Owner Phone:
- (512) 930-3652
- Contact Name:
- Wesley Wright
DESIGN FIRM
- Design Firm Name:
- LJA Engineering
- Design Firm Address:
- 2700 La Frontera, Ste. 150
- Round Rock, Texas 78681
- Design Firm Phone:
- (512) 767-7300