PROJECT
- Project Name:
- Kirkwood Paving & Drainage Project from Briar Forest to Westheimer Road
- Project Number:
- TABS2022026894
- Facility Name:
- Kirkwood Paving & Drainage Project
- Location Address:
- Kirkwood Road
- Houston, TX 77077
- Location County:
- Harris
- Start Date:
- 11/1/2022
- Completion Date:
- 6/30/2025
- Estimated Cost:
- $18,000,000
- Type of Work:
- New Construction
- Type of Funds:
- This project involves public funds, public land, or is a Federally funded roadway project.
- Scope of Work:
- Steet reconstruction, including roadway, sidewalks, shared use path, handicap ramps, and underground utilities.
- Square Footage:
- 10,000 ft 2
- Are the private funds provided by the tenant?
- No
- Current Status:
-
Inspection Complete
RAS
- RAS Name:
- DAVID S,DREPAUL
- RAS #:
- 1063
- RAS Address:
- 22211 FIELDS LN
- SPRING, TX 77389
- RAS Phone:
- (281) 350-1817
OWNER
- Owner Name:
- City of Houston
- Owner Address:
- 611 Walker Street, 17th Floor
- Houston, Texas 77002
- Owner Phone:
- (832) 395-2348
- Contact Name:
- Mr. Charles Jones
DESIGN FIRM
- Design Firm Name:
- Bowman Engineering/Consulting Inc.
- Design Firm Address:
- 7322 DW Freeway, Suite No. 806
- Houston, Texas 77074
- Design Firm Phone:
- (713) 779-2990