This project involves public funds, public land, or is a Federally funded roadway project.
Scope of Work:
Reconstruction project widening from 2-lane to 4-lane roadway with a two-way-left-turn lane. The project will include the construction of sidewalks along both sides of roadway, curb and gutter with a storm sewer system draining at two outfalls.